|


Oil platforms
of Magellan's Strait. Geovenor carried out the studies of soils
mechanics and the foundations project.
|
Geovenor
carries out integral geotechnical consultant that they go from the
underground recognition to the delivery of recommendations for the
design of the works foundations.
In the area of Geotechnical Consultant, Geovenor carries out:
- Evaluation
of the support capacity of the floor and design of direct foundations
and piles
- Analysis
of establishments
- Studies of
slope stability
- Reclamations
footprint
- Studies of
licuation risk
- Projects
of dynamic compactation
- Preload
And in general
all project type in the geotechnical scope.
Geovenor
has lent consultantship or had been part in its specialist quality
in the geotechnical area, in the main projects developed in the last
years for the most noted Chilean companies. Next a list is presented
with the main carried out projects:
- Project and Construction
of Foundations of 50 Oil Platforms of Production in Off shore locations,
Strait of Magellan for Ingeniería Civil Costa Afuera. Empresa
Nacional de Petroleos, ENAP Magellan. (1979 at 2000).
- Project and Construction
of Foundations of 6 Oil production Platforms in Off shore locations
Atlantic Platform Argentina for SIPETROL S.A. (1985 at 2000).
- Mejillones Complex Port
(MegaPuerto-Mejillones), for Belfi S.A. (1989 at 2001)
- Muelle Ballena. Trow Chile.
Pargua, Chacao Channel, for Aldunate y Asoc. Ltda. (May 2001).
- Amplification Site Nº
8 San Antonio's Port , San Antonio, V Region. Empresa Portuaria Panul
S.A., para Arze y Reciné Ingenieros Consultores (Ago. 2000).
- Project of Reclamations
of Terrestrial Riverside North River Bío-Bío. Via Troncal
and Connections of Coastal among Puente Nuevp and Chiguayante, Concepción.
MOP, para Consorcio CCP-AC Ingenieros Consultores Ltda. (1999).
- Punta Loros Port, Huasco.
Marine and Terrestrial Facilities project, Cementos de Chile S.A..
(Nov. 1998).
- Las Lozas Port, Huasco.
Cemento Polpaico S.A.., for Arze, Reciné y Asociados Ingenieros
Consultores (Nov. 1998).
- Storage and Shipment of
Sulfuric Acid project, San Antonio Port, Terminales Quimicos S. A.,
for. Empresa Constructora Santa Magdalena (February - 1998).
- Pier of Shipment of Concentrated
of Copper in Punta Chungo - Los Vilos, Compañia Minera Los
Pelambres, for Bechtel Chile Ltda. (Dic. 1997 to May. 1998).
- Ports in Porvenir and
Puerto Arturo, Tierra del Fuego. Magallanes, Compañia Interoceánica
Tierra del Fuego S.A. (Mar.1997).
- Stagnates Construction
of 125.000 barrels project. Terminal Gregorio, Punta Arenas., Empresa
Nacional de Petroleos (ENAP) (Ene. 1997).
- Plant of Production of
Ammonia, Pier Cabo Negro Sector, Punta Arenas. Consorcio Sigdo Koppers-ENAP
(Jun. to Ago. 1996 and Ene. 1997)
- Geotechnical consultant
of the Arica Port. Empresa Portuaria de Chile (EMPORCHI). (November
1996).
- Works of Amplification
in Port of Puerto Montt, EMPORCHI (Nov. 1996)
- Arica Port. Sitio 3 and
Future Grain terminal, EMPORCHI (Nov. 1996).
- South Santiago's Water
Treatment Plant South for Empresa Metropolitana de Obras SanitariasEMOS
S.A.. (April to August 1996)
- Terrestrial areas of Amplification
of San Antonio's Port. Address of Port Works, Ministerio de Obras
Publicas (MOP), (April to Julio 1996)
- New Shipyard of ASENAV
project, Valdivia, X Region, ASENAV S.A. (March -1996)
- Terrestrial Facilities
Shipment Terminal of Concentrated of Copper, Punta Patache, Iquique.
Cía. Minera Doña Inés de Inés of Collahuasi.
(May. 1995)
- Stability Study of the
the Pier in Arica Port. EMPORCHI. (April - 1995).
|